The Whisby-6 well was successfully drilled in 2016 and encountered a good oil-saturated basal sandstone with initial production of 168 barrels of oil per day (of which Terrain receives 85% until it has recovered its drilling costs, reducing to 62.5% until 250,000 barrels in total have been produced, after which it drops to 50%). The well is still free-flowing some 8 months after production started but it is anticipated that it will be put on pump early in 2017.